Vertimax Australia was engaged to replace 46 panels of glass panels and re-caulk the entire Atrium roof on completion. The project being a design and construct, seen us design, manufacture and install three purpose built lifting gantries to be placed across the Atrium sections to allow for...

Vertimax Australia was engaged to complete the major upgrade works on the Rod Laver Arena moving roof during 2017 and 2018. On completion the roof has been transformed from a 35-minute opening and closing time down to a 5-minute time frame. The goal was 8-minute timeframe. The structural upgrades completed in 2018 saw the roof jacked up on purpose-built jacks and...

To complete the stage one electrical upgrade works on the Rod Laver Arena roof. The project had tight time lines and had to be completed and commissioned prior to the start of the 2016 Australia Tennis Open. The project was a great success and the roof ran well through out the...