logo
Copyright Vertimax Australia 2019

Archive

Vertimax was awarded the tender to supply and install a new two-level elevator system within the facility. A new concrete filled brick shaft was designed and manufactured in consultation with our engineers to ensure the new lift had a solid foundation to which the lift could...

Vertimax Australia has been engaged to replace the Building Maintenance Unit at 360 Collins Street. The project was delivered on time and on budget. The extent of the Building Maintenance Unit upgrade works encompasses the design, documentation, manufacture, supply, delivery, installation, testing, commissioning and 12 months...

To replace a panel of glass within the building. The external of the building was accessed via the BMU (Building Maintenance Unit) with the glass being reversed glazed. Therefore the glass was push through the opening and then sat into position. This way of replacing glass...

Vertimax Australia was engaged to replace 46 panels of glass panels and re-caulk the entire Atrium roof on completion. The project being a design and construct, seen us design, manufacture and install three purpose built lifting gantries to be placed across the Atrium sections to allow for...

Vertimax Australia was engaged to complete the major upgrade works on the Rod Laver Arena moving roof during 2017 and 2018. On completion the roof has been transformed from a 35-minute opening and closing time down to a 5-minute time frame. The goal was 8-minute timeframe. The structural upgrades completed in 2018 saw the roof jacked up on purpose-built jacks and...