BMU Replacement 80 Collins St

Location

80 Collins Street, Melbourne

Project

Replacement BMU

Download Case Study

Reducing maintenance costs and complexity with an innovative single BMU system.

80 Collins Street, Melbourne, is a high-profile commercial building with a unique and complex facade consisting of eight faces.

The building’s original Building Maintenance Unit (BMU) weighed nearly 13 tonnes and was bulky, outdated, and difficult to maintain. Additionally, a second BMU had been installed in 1994, but operational inefficiencies required a safe separation between the two BMUs, causing logistical challenges. The client sought a modern, cost-effective solution that would improve maintenance accessibility while reducing long-term operational costs.


The Challenge: Overcoming Logistical and Structural Hurdles

The project presented several challenges, including:

  • Transport & Assembly: The new BMU had to be transported to the rooftop via the building’s goods lift, requiring meticulous planning to ensure each component fit within the lift’s dimensions.
  • Structural Adjustments: The existing track system required extensive upgrades, including welding a 30mm flat bar every 200mm along its entire length and reinforcing it with gussets for additional support.
  • Dismantling the Existing BMU: The original unit had to be carefully cut into sections small enough to be manually removed via the lift, necessitating full scaffolding for a safe and controlled process.
  • Limited Crane Access: With traditional craning methods unfeasible, the existing column BMU was modified into a temporary crane, equipped with an extended jib to lift and assemble the new unit with just 2mm of clearance.


The Vertimax Solution:  A Smarter, More Efficient BMU System

Vertimax developed an innovative solution to replace both BMUs with a single, highly efficient system, significantly reducing maintenance costs and operational complexities. The new building maintenance unit featured:

  • Turret and cage slewing for enhanced manoeuvrability.
  • Three custom cage sizes to accommodate varying facade dimensions.
  • Multi-Level access decks for maintenance and emergency descent.
  • Cross-Arm sheave adjustments to adapt to different cage configurations.
  • Integrated 240V power supply within the BMU cage for operational ease.

By leveraging creative engineering and meticulous planning, Vertimax successfully navigated the project’s challenges while ensuring safety, compliance, and long-term efficiency.


The Result: A Streamlined, Cost-Effective Facade Access System

The project was completed seamlessly, eliminating the need for a second BMU while enhancing the building’s maintenance capabilities. The installation marked Australia’s first GinD manufactured BMU, reinforcing Vertimax’s reputation as a leader in innovative building access solutions. By reducing equipment complexity and long-term costs, our solution delivered a safer, more efficient, and cost-effective building maintenance system tailored to the needs of 80 Collins Street.