five D BMU (Building Maintenance Unit) Track & Roof Membrane

About This Project

 

To complete waterproofing system on the entire rooftop area.

To prolong the life of the new membrane system the BMU running plates were also installed along the entire length of the buildings perimeter.

On completion of the works all previous water leaks were ceased.

 

Location

305 William Street Melbourne

Client

five D

Project

BMU Track & Membrane Upgrade

Duration

4 months