logo
Copyright Vertimax Australia 2019

Archive

Vertimax Australia was engaged to do a complete Design, manufacture and Installation of a multi layering winch system to bring the BMU up to a more modern design. The replacement of the Tirak winches with a multi layering winch allows the installation of wire ropes with internal...

To complete waterproofing system on the entire rooftop area. To prolong the life of the new membrane system the BMU running plates were also installed along the entire length of the buildings perimeter. On completion of the works all previous water leaks were ceased....

The Vertimax team has maintained the moving roof at Marvel Stadium since its construction. After many years of uninterrupted service, a need to replace the connecting slide bearing between the bogies and the roof structure arose. As the original manufacturer of the bearings has since ceased...

Vertimax Australia was engaged in May 2019, by the overseas manufacturer and Multiplex Constructions to complete the final installation of the large and complex BMU at Collins Square Tower 5. The two previous local independent BMU companies engaged for the installation works and the local head...